My Future Home – Part III

Finally… after waiting for almost 3 years and 11 months, HDB invited us for our BTO flat key collection in first week of Oct. It was such a long wait… I have waited from being single to married to pregnant, to giving birth to my daughter becoming a 17-month-old toddler. GOSH! Dear HDB, you really need to speed up in flat building!! This Lego-like technology in construction doesn’t seem to shorten building time, does it? Plus, we appealed for earlier key collection date, but ended up getting it later than people who didn’t appeal. WTF?!

Anyways… we got the key. Y-E-A-H…

Our appointment was at 12.15pm, we got there 40 mins earlier and got a queue number by scanning our appointment letter at the HDB hub.

What to bring:

  1. Original NRIC of applicants
  2. Original NRIC of occupiers (if any)
  3. Original birth certificate of children below 15 years old (if any)
  4. Latest CPF Statement
  5. Certificate of Fire Insurance

The husband had applied for the fire insurance from ETIQA, activated electricity and water from SP services online prior to the key collection day.

When our queue number is called, we headed to the assigned cubicle to meet the HDB officer. There was a lot of paperwork and lotsa signatures from us. Then we have to login using Singpass to submit/authorise HDB to wipe out our hardearned CPF… *sobz*
Once this is done, the husband has to go to level 3 to pay the Conservancy Charges of $74.20 (Fees for 5-room flat). We filled in the GIRO form for monthly deduction of this Conservancy Charges but it will take about 2 months to process (according to the HDB officer). So meanwhile, we have to remember to pay the monthly charges on time as there will not be any letter or reminder. Late payment will incur a penalty of $5.

After all the paperwork is done, the HDB officer presented the keys to us~

IMG_8450

After getting our keys, we chose an auspicious date to open the door of our new home.

IMG_8319

This important task has to be completed by me~
=)

IMG_8324

We were welcomed by these flyers on the floor. The vendors must have slotted these through our house door when the barricades below our flat were removed and they could access to the units on each floor.

The view of our living and dining area. It is much smaller than what we expected. We felt cheated by the floor plan. But we were pleased that the ceiling (top floor) is higher compared to our neighbour’s unit below us. After measuring, the floor to ceiling height is 2.78m. This is almost 20 cm higher than the standard 2.6m for other non-top-floor units. The house feels less claustrophobic but we would have to fork out more for carpentry works.

IMG_8339

The view from my living room.

IMG_8337

This is the smaller bedroom 3. Notice the 5 ugly awning windows? I wonder which weirdo designs this. Did he/she think that it’s fun to have to open so many windows or cleaning them? Or did he/she not know that this type of casement/awning window always gives hinge problems? And what’s worse? HDB does not allow us to change them to sliding windows… =___=”

My very tiny kitchen plus service yard. Smaller than my office pantry sink area…
Good news? There is no piping on the kitchen ceiling because we are at the top floor.

IMG_8371

The laundry racks which I hated the most. Other than floor mats or cleaning rugs, I will never hang any clothes on these racks. See how close the racks are to the wall? All the clothes hung there will be brushing against the wall and indirectly cleaning the external wall. #nocommonsense

IMG_8348

The very small bomb shelter which will serve as a store room.

IMG_8356

The slightly bigger bedroom 2.

This is the master room. It’s longer but very narrow.

Master room toilet. No ugly pipes on the ceiling as well. We opt out for the sanitary fittings so the toilet only comes with a toilet bowl.

Common toilet. A big window for accessing to the air con ledge.

Ok, so that’s it for the house tour.

In case you were wondering what ritual we did for the door opening day, this is it:

IMG_8369

An offering of McD breakfast set, placed in the middle of the living room.

LOL!!

We didn’t do any ritual at all. Just ate out breakfast there, and then got started on the defects inspection.

I will write about the defects inspection in another post. So stay tuned!

Advertisements

2 responses to “My Future Home – Part III

  1. hello!

    it was very interesting to read about ur experience. can the windows be changed at all? does hdb allow it? or only sliding windows cant be installed

    • Hi, can’t change the windows to sliding windows. But I didn’t ask if it can be changed to another casement window.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s